• Predictive Analytics for Improved Cost Management  



Blog



Original Post Date: Wednesday, September 25, 2013 The “Systems Folder” cost object which is found at the start of every TruePlanning Project is most often confused with the “Folder” icon. These two however should not be confused. The “Folder” icon does not have an input sheet at all. It is not a cost object and contains no cost estimating logic or relationships.  It is provided as a collection point so that cost objects can be grouped in ways for clarity like to separate out phases of the acquisition lifecycle or to divide costs between subcontractors, etc.  Whereas, the “System Folder” contains all ...
Original Post Date: Wednesday, September 25, 2013 A lot of clients have been expressing interest in modeling ASICs, FPGAs, and various other electronic modules inside TruePlanning® (TP). In the release of TruePlanning® 2014 there will now be the capability to model all these products inside our framework. Not only will you be able to model these products but you will of course be able to model the integration cost of these electronic components with Hardware and Software components. In addition you would be able to add and estimate the program management of your total project through our integrated framework. TruePlanning Microcircuits ...
Original Post Date: Wednesday, September 25, 2013 In Government contracting all contracts are made up of a network of suppliers. The Prime contractor who won the overall bid usually has a supply chain of vendors from whom they receive their products and services. In addition they have Subcontractors who provide services under a contracted agreement of work. These vendors and subcontractors most likely have their own network of suppliers which allows for a cost-effective supply chain that extends across America and to other nations. Vendors sell identical or similar products to different customers as part of their regular operations. These ...
Original Post Date: Wednesday, September 25, 2013 “Integration Factors – What Makes TruePlanning™ Stand Out in the Crowd” In today’s world, system integration is becoming more and more important. The government has started asking for designs that have additional capabilities, which allow connectivity both with systems under construction and systems already in use and deployed. The reason systems integration is important is because it adds value to the system by adding abilities that are now possible because of new interactions between subsystems. In a recently posted article on “The True Costs of Integration” the writer defined the costs of a typical integration ...
Original Post Date: Wednesday, September 25, 2013 Introduction/Problem Statement A current client has expressed interest in the default values on the simple vs. the detailed input sheet. More specifically the question arose because this particular customer as well as others had a misconception about the simple vs. the detailed input sheet default values. Most users did not realize that if they were only inputting values on the simple input sheet that the detailed input sheet default values were still be used in the calculation for their cost estimate. So the question became how much are each of these default value inputs ...
Original Post Date: Wednesday, September 25, 2013 What follows is PRICE's interpretation of how to model FPGA’s and ASICs inside our current version of TruePlanning® 2012 SR2 and older versions. ASICs are an application-specific integrated circuit, customized for a particular use. FPGAs are Field-programmable gate arrays and are considered the modern-day technology that can be used in many different applications because of the programmable logical blocks. In industry ASICs has grown from 5,000 gates to over 100 million. Designers of digital ASICs use a VHDL language for the functionality.   Estimating Best Practice for TruePlanning: Model your electronics at the board level ...
Original Post Date: Wednesday, September 25, 2013 Last November I hosted a webinar that discussed the use of the companion applications Live! This session helped to further explain how to use them in congruence with TP, the history, & why we created them, etc. During the presentation I showcased the success’s I have encountered with using them both in the recent AOA I described in part 2 and this blog part 3. You can find the recorded webinar on our site. In addition I described as I am going to do here the differences between the large project engine and the excel ...
Original Post Date: Wednesday, October 17, 2012 PRICE was recently tasked by a client to provide an Analysis of Alternatives (AOA). As we assembled a team to complete this, I was tasked with modeling all the alternatives inside TruePlanning.  After the initial data call, we realized that this project would be cumbersome due to the large amount of data. While developing the project plan, I had to think of a crafty way to get data in and out of TruePlanning efficiently. It was interesting to note how much capability I could utilize from the TruePlanning Companion Applications to effectively support ...
Original Post date: Wednesday, October 10, 2012 Deciding whether Excel® is a friend or foe is a hefty topic, so I decided to dedicate several blog posts to the issue!  This first posts addresses all of PRICE’s new boundless Companion Applications.  The second will address my experience using the applications with our customers (Do’s and Don’ts); and lastly, the third and final blog will wrap it up and explain a more in-depth large project engine that PRICE is currently testing.  As we all know Microsoft Excel® is a powerhouse tool.  It allows you to house data, format it in many ...
Original Post Date: Wednesday, May 18, 2011  Parametrics is more than estimating. It represents the complete process of capturing and utilizing (often with calibration) non-cost drivers, as well as associated programattics and configuration levels. The Wiki definition of systems engineering immediately speaks to project complexity, life cycle management, and logistics. Any question that parametrics and systems engineering are interrelated?  In many of our customer organizations, affordability and cost-benefit analyses have migrated to system engineering functions. How and where does your organization perform these analyses?  As we enhance our capabilities and applications, it’s beneficial for all concerned to understand your adaptation of parametrics within the core ...