• Predictive Analytics for Improved Cost Management  



Blog



Original Post Date: Monday, August 1, 2011 After many years of working with systems engineers and design engineers it became apparent to me that the cost of the system they were designing / building mostly seemed to be an after thought. Maybe not by the Lead Systems Engineer or Program Manager but certainly down in the trenches. The engineers working at the subsystem, component, and element levels always expressed frustration with having too much to think about to add one more variable, such as cost estimation, to their work load. I posit that this can no longer be the case. In ...