Original Post Date: Wednesday, September 1, 2010 I had expected to present my webinar,  “Best Practices for Cost Effectiveness Studies using TruePlanning” in early August. As you might know, I was planning to show a real world example from a recent engagement with a government customer. Unfortunately, since the Source Selection has not concluded with a downselect, I was not able to obtain the public release in time. However, for this month’s blog I will continue share some of the highlights of the webinar.   In last month’s blog we explored the uses of TruePlanning during Source Selection from the Supplier’s (or ...
Original Post Date: Wednesday, November 10, 2010 I was recently struck by Ash Carter’s (Under Secretary of Defense for Acquisition, Technology & Logistics) Memorandum for Acquisition Professionals, Better Buying Power: Guidance for Obtaining Greater Efficiency and Productivity in Defense Spending (14 September 2010). Within this broad sweeping memo, Ash Carter outlines 23 principal actions in five major areas aimed at increasing efficiency in Defense acquisition.  The first major area covered is “Target Affordability and Control Cost Growth”. Within this major area, program managers must treat affordability as a requirement before milestone authority is granted to proceed (starting with Milestone A). This ...
Original Post Date: Friday, December 17, 2010 In last month’s blog I wrote about Ash Carter’s (Under Secretary of Defense for Acquisition, Technology & Logistics) Memorandum for Acquisition Professionals, Better Buying Power: Guidance for Obtaining Greater Efficiency and Productivity in Defense Spending (14 September 2010). I concluded the TruePlanning unified framework and comprehensive cost models, is a tool very well suited to provide the types of analysis outlined in the memorandum. In terms of Should Cost and Independent Cost Estimates (ICE), TruePlanning estimation software provides the industry standard capability to conduct Should Cost and calibration (actual program history) for ICE. Most ...
Original Post Date: Wednesday, June 23, 2010 Parametric modeling is excellent for all aspects of early-concept cost estimation, including go/no-go decisions downstream. So, in the spirit of bringing a transparency to (ethical) financial engineering… why not apply our craft to pricing “real-options”? The latter are essentially strategic opportunities for engaging resources (cost/schedule) into projects, ventures, investments, or even abandonments. The opportunity choice has value itself!  Unlike static project Net Present Value (often, but not exclusively, approximated with Discounted Cash Flow) assuming pre-defined decisions, real-options reflect the merit of flexibility. If an R&D or proof-of-concept presents viability/ marketability learning, the option has positive value, above ...
Original Post Date: Friday, June 25, 2010  Like titanium and other exotic metal-materials, “composites” (by definition, combinations of materials) offer significant weight-savings and reduced part counts, but at a price of high production cost. Sound contrarian to our parametric cost estimating view?   Not really. Complexity of manufacture is quite higher. Likewise process index and structural tooling values grow. Plus, design lead times drive developmental cycles. That said, understand that composites represent more than a material type. They can involve a highly labor-intensive approach to preparing, braiding/ winding, molding, bonding and modular assemblage. Yes, some aspects of braiding and molding lend themselves to automation—which then drives tooling ...
Original Post Date: Thursday, October 7, 2010 Ahhhh, the 80s… a challenging (but often confusing) time in an evolving computing world.  Working in 1985 as a software estimator as well as SQA engineer in a quality assurance department that “audited” real-time projects using new concepts like OOD & OOP… well, you get the picture.  It was a great time to get immersed into great work.  And the good news:  that company’s process as well as its developers were bullish on a young estimation/ quality types asking plenty of questions… as long as they were of the Yes-No variety.  And ...
Original Post Date: Tuesday, August 24, 2010 Over the past several weeks several users have inquired about the best way to estimate costs associated with porting existing software to a new hardware environment. Normally for this situation some of the existing software will require some amount of adaptation to operate on a new server. However, a large portion of the existing software will only require integration into the new environment.   Estimating software costs associated with the above will require the use of several cost objects: - Systems cost object if program management, Quality Assurance, configuration, and    documentation costs are to be included in ...
Original Post Date: Monday, June 7, 2010 Currently we are exploring the best approach to including a more comprehensive cost estimate for Total Ownership Costs (TOC) into TruePlanning. The current version of the software has focused on development and production costs with some life cycle costing including. The life cycle costs included are focused on the system specific O&S costs such as initial spares for priming the supply pipeline, maintenance, replenishment spares, etc. It is a system view as opposed to a program view of TOC. As we better understand the need to conduct affordability studies it has become clear that design decisions ...
Original Post Date: Monday, September 20, 2010 I have been fortunate in my career to have been associated with some great mentors. Each individual has provided me a bit of a golden nugget to carry with me as I tried to navigate my way through the professional waters. My first “civilian” manager, after I left the service and joined industry, provided me a list of the Laws of Analysis (I had just started a position as an operations research analyst). He explained that this list was a mix of serious and tongue in cheek snippets of wisdom. I looked at ...
Original Post Date: Monday, August 18, 2014 I had the distinct pleasure last week of attending the 2014 NASA Cost Symposium.  While to the uninitiated this might sound like a bit of a snoozer – it was actually quite interesting and proved to be the source of a ton of valuable information.  The event took place at Langley Research Center in Hampton, VA – near Williamsburg, Newport News, and not too far from Virginia Beach.  My participation was somewhat self-serving in that I was there to talk about PRICE’s new Space Missions Cost Models for TruePlanning®.  This model – discussed ...