• Predictive Analytics for Improved Cost Management  



Blog



Original Post Date: Thursday, July 17, 2014 Introduction Parametric cost estimates provide high quality, defendable estimates early in a project’s life cycle. This makes them ideal when producing bid and proposals. The nature of parametric cost estimates, however, requires the results of the estimate to be framed in terms of specific CERs and Activities and Resources. It is common for an organization to have a more granular set of Resources than the ones used to support the CERs. One approach to resolving this issue would be to use the TrueMapper application from PRICE Systems to map TruePlanning Resources to a more ...
Original Post Date: Thursday, July 10, 2014 Introduction TruePlanning provides a powerful and highly customizable reporting environment. Project data can be viewed from many different perspectives and those perspectives can be saved and reused across all projects. Results can be exported to Excel and Word as custom reports. There are, however, some instances where there is a need to get beyond the two axes used in TruePlanning’s reporting engine. This need is sometimes expressed by users preparing TruePlanning cost estimating project data for use in a bid or proposal. Perhaps the data needs to be split by phase and labor/non-labor over ...
Original Post Date: Tuesday, July 1, 2014 Whether you’re doing a software cost estimate to support a Bid and Proposal effort, a software valuation, should cost analysis, or to develop a detailed project plan, it is vitally important to understand the ‘size’ of the software you are estimating.  The problem with software size is that it tends to fall into the intangible realm of reality.  If you tell me you are building a widget that weighs 13 pounds, I can really start to get my head around the task at hand.  If I’m chatting about this with my European colleagues, ...
Original Post Date: Friday, June 20, 2014 Proposal estimates based on grassroots engineering judgment are necessary to achieve company buy-in, but often are not convincing or not in sync with the price-to-win.  This contention can be resolved through by comparing the grassroots estimate to an estimate developed using data driven parametric techniques.  Parametric estimates apply statistical relationships to project data to determine likely costs for a project.  Of course, for a parametric model to properly support this cross check of the grassroots estimate, the proper data must be fed into the model.  This most likely requires the estimator to reach ...
Original Post Date: Wednesday, April 2, 2014 Introduction Parametric estimates provide reliable, reproducible, and flexible views into cost and effort so it’s only natural to want to include this data in a bid and proposal workflow. With TruePlanning 2014 big steps have been taken to make such integration seamless and easily reproducible.  New tools in the TruePlanning suite of products, as well as, integrations with some of the major bid and proposal software applications are at the heart of this new feature set. You can learn more about TruePlanning 2014 and the PRICE cost estimation models at our website, but let's ...
Original Post Date: Thursday, March 20, 2014 Here’s a conundrum.  You are a software estimator responsible for helping the decision makers in your company determine what business to pursue and what business to steer clear of.  You know, that to win profitable business, your company first needs to decide which opportunities are golden and which should be avoided.  You also know, that at the point at which this decision needs to be made, there is very little information available to support a quality estimate.  Add to this the fact that software estimation is hard   at almost any stage.  What’s ...
Original Post Date: Monday, December 30, 2013 Unless you live under a rock, you are aware of the healthcare.gov rollout disaster.  While similar IT failures are regularly in the news, the high profile of healthcare.gov has really mainstreamed awareness of the fragility of many IT projects.  Check out this article entitled ‘The Worst IT project disasters of 2013’.  It details IT project failures such as:  IBM’s failure to deliver on a payroll system project that could potentially cost taxpayers up to $1.1 Billion dollars US.    SAP’s failure to deliver satisfactorily on requirements for ...
Original Post Date: Wednesday, October 30, 2013 Agile development practices have enabled software development organizations to deliver quality software that optimizes the customer’s satisfaction with the value they receive for their money.  That being said, agile development may not be the best approach for every software development project.  Alistair Cockburn, agile development specialist and one of the initiators of the agile software development movement, acknowledges that “agile is not for every project”.  Further elucidating this point, Cockburn opines:  “small projects, web projects, exploratory projects, agile is fabulous; it beats the pants off of everything else, but for NASA, no”. .  ...
Original Post Date: Friday, October 4, 2013 In Parametrics is Free, I acknowledged receiving (too late) “you should’ve known to ask that” over the years. Quality control after-the-fact is fine; but it’s better and cheaper to take a systematic approach to quality assurance as part of your estimating process. The sheer volume of what we model can often keep us so close to the details that we are unable to step back and put on our QA hat on for a sanity check. Enter Quality! On a very large project, our team has introduced a few regular cross-checks, notwithstanding typical ...
Original Post Date: Friday, October 4, 2013 Like titanium and other exotic metal-materials, “composites” (by definition, combinations of materials) offer significant weight-savings and reduced part counts, but at a price of high production cost. Sound contrarian to our parametric cost estimating view? Not really. Complexity of manufacture is quite higher. Likewise process index and structural tooling values grow. Plus, design lead times drive developmental cycles. That said, understand that composites represent more than a material type. They can involve a highly labor-intensive approach to preparing, braiding/ winding, molding, bonding and modular assemblage. Yes, some aspects of braiding and molding lend themselves ...