• Predictive Analytics for Improved Cost Management  



Blog



Original Post Date: Wednesday, September 25, 2013 These days bidding can be a game, and contractor leadership is constantly making decisions on whether to take on risk in order to stay competitive or to bid conservatively for the safety of not overrunning.  You may complete a cost model for a program, and spend time analyzing the uncertainties behind each input and in the end find that your estimate lands at the 30% confidence level.  After some strategic analysis, the bid leadership team decides, we would like to bid at the 80% Confidence level, “please present your estimate to support that total”.  ...
Original Post Date: Wednesday, September 25, 2013 Background: FPGA design typically uses a library of Tiles (Sets of gates and transistors) and a CAD system to physically lay out the actual active devices on an empty portion of substrate. These devices are interconnected by physical (usually copper) traces to route the signals and perform the desired tasks. The design may be totally customized for a single set of functions and may not need any form of programming. Other designs may allow some parts of the device to be electronically re-programmed to allow the device to be calibrated or adjusted for ...
Original Post Date: Wednesday, September 25, 2013 During a recent Analysis of Alternatives (“AoA”) consulting project, our customer asked that we provide more insight into TruePlanning’s System and Assembly objects, which in our AoA context we termed Systems Engineering/ Program Management (SE/PM) and Alternative Integration/ Test, respectively. The customer’s challenge was understanding our parametric model’s treatment of principally hardware-COTS objects, combined with other cost, purchased service and training objects.Our Chief Scientist, Arlene Minkiewicz, provided us with insights that I’d like to share with you, as well as my views on how we at PRICE systems have consistently used these parent ...
Original Post Date: Wednesday, September 25, 2013 It is impossible to find a news website or magazine that is not full of articles on the effects of Sequestration.  As a cost estimator, I find the topic very interesting (and troublesome).  The immediate effects of Sequestration are widely discussed.  However, I do not see quite as much news coverage on the second and third order effects of this extremely complex policy decision. The Department of Defense (DoD) has a specific target that must be removed from the budget over the next 10 years.  Some analysts claim a doomsday scenario.  Others claim it ...
Original Post Date: Wednesday, September 25, 2013 In a recent National Public Radio (NPR) interview, Winslow Wheeler (Director of the Straus Military Reform Project of the Project on Government Oversight in Washington, D.C.), spoke on the recent problems with the Joint Strike Fighter acquisition process.  “Wheeler explained that Lockheed Martin, the manufacturer of the jet, uses a pricing vocabulary that masks costs. ‘Flyaway costs, non-recurring and recurring costs, and lots of gobbledygook, and they’ll say that comes to a number like $60-$70 million dollars. And, it’s complete baloney,’ said Wheeler.” (pogo.org)    The F-35 has the distinction of being the most ...
Original Post Date: Wednesday, September 25, 2013 Last November I hosted a webinar that discussed the use of the companion applications Live! This session helped to further explain how to use them in congruence with TP, the history, & why we created them, etc. During the presentation I showcased the success’s I have encountered with using them both in the recent AOA I described in part 2 and this blog part 3. You can find the recorded webinar on our site. In addition I described as I am going to do here the differences between the large project engine and the excel ...
Original Post Date: Wednesday, September 25, 2013 We have been blogging a lot lately about finding the right manufacturing complexities for your hardware  projects using TrueFindings, and the many ways you can determine the most appropriate Manufacturing complexities: taking averages from related projects, finding a correlation to another descriptive parameter (like horsepower for engines), or even looking into multi-variate regression to determine the best value.  If you are a TruePlanning user, you know that Manufacturing Complexities (for structure or electronics) are the most common parameter to use in calibration, and that the manufacturing complexity drives both Production and development ...
Original Post Date: Tuesday, September 24, 201 Risk Analysis Methodology Overview – Method of Moments In this second of three articles on risk analysis, we will discuss Method of Moments.  Method of Moments (MoM) is an alternative to Monte Carlo simulation.  Along with the methodology, we will present some pros and cons of using MoM over Monte Carlo.  What is a moment? Before we discuss the methodology behind MoM, we first need to talk about moments.  Caution:  for all the master statisticians out there, this article is meant to boil down complex topics in an easy to understand manner.  There are obviously ...
Original Post date: Wednesday, October 10, 2012 Deciding whether Excel® is a friend or foe is a hefty topic, so I decided to dedicate several blog posts to the issue!  This first posts addresses all of PRICE’s new boundless Companion Applications.  The second will address my experience using the applications with our customers (Do’s and Don’ts); and lastly, the third and final blog will wrap it up and explain a more in-depth large project engine that PRICE is currently testing.  As we all know Microsoft Excel® is a powerhouse tool.  It allows you to house data, format it in many ...
Original Post Date: Tuesday, October 2, 2012 This past year PRICE Systems has entered into a partnership with the International Benchmark Standards Group (ISBSG).  As part of this partnership we have a corporate subscription to both of their databases – the Development and Enhancement Database and the Maintenance and Support Database.  We can use these for analysis and to develop metrics that will help TruePlanning users be better software estimators.  The ISBSG is one of the oldest and most trusted sources for software project data.  They are a not for profit organization dedicated to improving software measurement at an international ...