• Predictive Analytics for Improved Cost Management  



Blog



Original Post Date: Friday, July 25, 2014 July 2014 marked the 25th anniversary of Neil Armstrong’s historic stroll on the moon.  If you go to the NASA website and select Missions you’ll probably be amazed at the number of missions in NASA's past, present, and future.  Unless you’re living under a rock, you know about the International Space Station, and the Hubble telescope but I’m guessing there’s a lot about space missions that many of us are unaware of.  The Dawn spacecraft, which was launched in 2007 from Cape Canaveral, was sent into Space to help NASA scientists learn about the history ...
Original Post Date: Thursday, July 17, 2014 Introduction Parametric cost estimates provide high quality, defendable estimates early in a project’s life cycle. This makes them ideal when producing bid and proposals. The nature of parametric cost estimates, however, requires the results of the estimate to be framed in terms of specific CERs and Activities and Resources. It is common for an organization to have a more granular set of Resources than the ones used to support the CERs. One approach to resolving this issue would be to use the TrueMapper application from PRICE Systems to map TruePlanning Resources to a more ...
Original Post Date: Tuesday, July 1, 2014 Whether you’re doing a software cost estimate to support a Bid and Proposal effort, a software valuation, should cost analysis, or to develop a detailed project plan, it is vitally important to understand the ‘size’ of the software you are estimating.  The problem with software size is that it tends to fall into the intangible realm of reality.  If you tell me you are building a widget that weighs 13 pounds, I can really start to get my head around the task at hand.  If I’m chatting about this with my European colleagues, ...
Original Post Date: Friday, June 20, 2014 Proposal estimates based on grassroots engineering judgment are necessary to achieve company buy-in, but often are not convincing or not in sync with the price-to-win.  This contention can be resolved through by comparing the grassroots estimate to an estimate developed using data driven parametric techniques.  Parametric estimates apply statistical relationships to project data to determine likely costs for a project.  Of course, for a parametric model to properly support this cross check of the grassroots estimate, the proper data must be fed into the model.  This most likely requires the estimator to reach ...
Original Post Date: Wednesday, April 2, 2014 Introduction Parametric estimates provide reliable, reproducible, and flexible views into cost and effort so it’s only natural to want to include this data in a bid and proposal workflow. With TruePlanning 2014 big steps have been taken to make such integration seamless and easily reproducible.  New tools in the TruePlanning suite of products, as well as, integrations with some of the major bid and proposal software applications are at the heart of this new feature set. You can learn more about TruePlanning 2014 and the PRICE cost estimation models at our website, but let's ...
Original Post Date: Thursday, March 20, 2014 One of the complications in generating Bids and Proposals for Modules and Microcircuits is determining the “Should Cost” for better cost realism. Most of the electronic modules and their components in the proposals are not actually manufactured by the Proposer, but rather by a subcontractor, thus becoming a Purchased item. It is difficult to determine the cost of making the Module, and determining a fair cost. Costs for the modules include Assembly and Test costs together with the component costs. Components such as ASIC’s (Application Specific Integrated Circuits), have both the cost of developing the devices and ...
Original Post Date: Friday, October 4, 2013 The late Norm Crosby’s “Quality is Free” taught us that an investment into quality is more than offset by prevention of defects based upon understanding of requirements. Only with the latter can lack of conformance (and subsequent costs) be captured and hence quantified towards quality. So how then is Parametrics relevant? Parametric estimating is more than cost modeling. Our craft represents an initial consulting function into the accuracy and completeness of program planning concepts. Our customers trust us to know when to ask and when to supplement. Yes, we are mathematical and financial modelers ...
Original Post Date: Friday, October 4, 2013 In his August 2010 blog-entry, Zac Jasnoff outlined typical client perspectives for the different types of analyses that True Planning can accommodate.  Working on a large project, we’ve experienced situations that, realistically, can happen where the initial intent... and model structuring… later has the boundaries of model appropriateness stretched.  An AoA, for example, is meant to measure deltas between baseline and its alternatives.  If common costs “wash” then they can be excluded… which becomes an issue when treated as a Rough Order Magnitude for customer budgeting. Likewise, if a ROM or ICE of ...
Original Post Date: Friday, October 4, 2013 In Parametrics is Free, I acknowledged receiving (too late) “you should’ve known to ask that” over the years. Quality control after-the-fact is fine; but it’s better and cheaper to take a systematic approach to quality assurance as part of your estimating process. The sheer volume of what we model can often keep us so close to the details that we are unable to step back and put on our QA hat on for a sanity check. Enter Quality! On a very large project, our team has introduced a few regular cross-checks, notwithstanding typical ...
Original Post Date: Friday, October 4, 2013 Like titanium and other exotic metal-materials, “composites” (by definition, combinations of materials) offer significant weight-savings and reduced part counts, but at a price of high production cost. Sound contrarian to our parametric cost estimating view? Not really. Complexity of manufacture is quite higher. Likewise process index and structural tooling values grow. Plus, design lead times drive developmental cycles. That said, understand that composites represent more than a material type. They can involve a highly labor-intensive approach to preparing, braiding/ winding, molding, bonding and modular assemblage. Yes, some aspects of braiding and molding lend themselves ...