In your webinar presentation--
Slide 21: NASA WBS mapping for the WBS 4.0 – this slide seems to indicate that this WBS is estimated by TP
Slide 35: Space Systems Object – this slide seems to indicate that this WBS is estimated by TP
Slide 48: Mapping Rules.. – this slide seems to indicate that this WBS is estimated by TP, but Notes column this very slide are contradicting this – by saying typically passed-thru what would be right approach; shall we have a pass-thru number for this WBS (4.0) or shall we assume that the TP estimate includes this WBS?

Good catch!  Slide 48’s note is incorrect.  The System object (for Payloads) does indeed include 04.Science/Technology (S/T)—

To watch the "Best Practices using the TruePlanning Space Missions" Webinar, click here.